HomeConstruction MEPHVAC & Mechanical

Construction HVAC & Mechanical Contractors in Dubai & the UAE

HVAC & mechanical contractors in Dubai & the UAE: AC installation, VRF/VRV, chilled water & chillers, AHUs/FAHUs, GI/PI ducting, testing, adjusting & balancing (TAB) and commissioning.

VRF & chilled waterto package units
AHU/FAHU& GI/PI ducting
TABair & water balancing
DEWAmechanical clearance
Overview

Construction HVAC & Mechanical Contracting

AlphaStone is an HVAC and mechanical contractor delivering the cooling and ventilation works on construction projects across Dubai and the UAE. Our in-house teams design, install and commission split, ducted and VRF/VRV systems, chilled-water plant, air-handling units and ductwork — sized to the building load and coordinated with the other trades before ceilings close.

Systems are engineered for the UAE climate and delivered to Dubai Municipality and DEWA mechanical-clearance requirements, with testing, adjusting and balancing (TAB) and full commissioning under load before handover.

  • Design & MEP/BIM coordination
  • Chilled-water, VRF & ducted systems
  • GI/PI ducting & insulation
  • TAB, commissioning & clearance
Get a Free Quote
HVAC & Mechanical Contracting

Air-conditioning & cooling systems

From split and VRF/VRV systems to central chilled-water plant, we supply, install and commission the cooling that suits the building type, load and budget.

  • Split, ducted & VRF/VRV systems
  • Chilled-water plant & chillers
  • Cooling towers & condensers
  • Chilled-water pumps & headers
  • Fan-coil units (FCU)
  • Refrigerant piping & charging
  • Package & rooftop units
  • Heat-load calculations

Ductwork, ventilation & air distribution

Ductwork first fix is installed and insulated before ceilings close; grilles, diffusers and units follow at second fix, with fresh-air and exhaust systems to code.

  • GI, PI & double-wall ducting
  • Thermal & acoustic insulation
  • Air-handling units (AHU/FAHU)
  • Fresh-air & pressurisation
  • Kitchen & car-park exhaust
  • Fire & volume-control dampers
  • Diffusers, grilles & louvres
  • Duct leakage testing

Piping, controls, TAB & commissioning

We complete the chilled-water piping and controls, then carry out testing, adjusting and balancing (TAB) and commission every system under load before mechanical clearance.

  • Chilled-water piping & insulation
  • Valves, strainers & balancing
  • Controls & BMS interface
  • Refrigerant charge verification
  • Air balancing (TAB)
  • Water balancing
  • Performance testing under load
  • DEWA mechanical clearance
How we deliver

Our HVAC construction process

1

Design & MEP Coordination

Load calcs, BIM/CAD coordination – duct routing and pipe chases agreed before ceilings close.

2

Plant & Piping

Chillers, pumps and chilled-water piping installed and insulated.

3

Ductwork First Fix

GI/PI ducting and insulation installed before ceilings.

4

Units & Second Fix

FCUs, AHUs, grilles, diffusers and connections completed.

5

TAB & Commissioning

Air and water balancing, refrigerant charge and performance testing under load.

6

Mechanical Clearance & Handover

DEWA / Municipality inspection, clearance, as-builts and O&M.

Standards & compliance

Compliant, balanced & commissioned

  • Dubai Municipality / DEWA mechanical clearance
  • ASHRAE-aligned design & load calculations
  • ESMA-compliant equipment & materials
  • Energy-efficient design & TAB reports
Get a Compliant Quote
HVAC & Mechanical Contracting standards
Where it applies

Industries & properties we serve

Villas & Homes
Offices
Retail & Malls
Warehouses
Hotels
Schools
Hospitals
Parking
Why it matters

Key benefits

Right-sized cooling loads

Clean GI/PI ductwork

Balanced (TAB) systems

Efficient VRF & chillers

BIM-coordinated install

Tested & commissioned

FAQs

Frequently asked questions

What HVAC systems do you install?

Split and multi-split, ducted/concealed, VRF/VRV and central chilled-water/chiller systems, plus AHUs, FAHUs, fan-coil units, ducting and ventilation.

VRF or chilled water – which is right for my building?

VRF/VRV suits villas and small-to-mid buildings needing zoning and simpler plant; central chilled water suits larger and industrial buildings. We recommend the right system from a heat-load calculation.

What ductwork do you fabricate and install?

GI, PI and double-wall ducting with thermal and acoustic insulation, plus dampers, diffusers, grilles and louvres, installed at first fix before ceilings close.

What is TAB (testing, adjusting and balancing)?

TAB is the process of measuring and adjusting airflow and chilled-water flow so every space gets its design condition. We carry out air and water balancing and issue TAB reports as part of commissioning.

Do you carry out MEP/BIM coordination?

Yes. We coordinate duct routing, pipe chases and electrical supply points with the other trades – using BIM where required – so services fit without clashes before ceilings are closed.

Do you size the cooling load properly?

Yes. We carry out heat-load calculations so systems are neither undersized (poor cooling) nor oversized (wasted energy), which matters in the UAE climate.

Do you obtain DEWA mechanical clearance?

Yes. After commissioning we coordinate the Dubai Municipality / DEWA inspection for mechanical clearance, and hand over as-builts and O&M manuals.

Which projects and emirates do you cover?

Villas, offices, retail, restaurants/F&B, and industrial construction projects across Dubai, Abu Dhabi, Sharjah and the UAE.

Where we work

Serving all seven emirates

Get a free quote

Start your project with AlphaStone

Free site survey and a no-obligation, fixed quote. Prefer to talk? Call or WhatsApp +971 56 409 7777.

  • Free site survey & honest advice
  • Transparent, fixed pricing
  • Compliant (SIRA / ADMCC / BICSI) design
  • One contractor for cabling, network & security

Request your quote

We reply within one business day.