Construction Electrical Contracting
AlphaStone is a DEWA-approved electrical contractor delivering the low-voltage (LV) electrical works on construction projects across Dubai and the UAE. From the incoming supply and main distribution boards to the last socket and light fitting, our in-house teams handle design, DEWA submissions, first- and second-fix installation, testing and commissioning — and coordinate the DEWA completion inspection that energises the building.
Every installation is built to DEWA technical regulations, UAE wiring rules and IEC standards, with load schedules and single-line diagrams prepared for authority approval and full, signed test records issued before handover.
- DEWA design, submission & approval
- First- & second-fix installation
- Testing, commissioning & certification
- Standby power & EV-charger ready
LV power distribution & panels
We supply, install and terminate the building’s low-voltage distribution — main and sub-distribution boards, LV panels, switchgear and busbar — sized from the approved load schedules and single-line diagrams.
- Main & sub-distribution boards (MDB/SMDB)
- LV panels, switchgear & busbar
- Power & sub-main cabling
- Cable sizing & load schedules
- Single-line diagrams for DEWA
- Busbar risers & containment
- Panel testing & labelling
- Power-factor correction
Wiring, lighting & small power
First-fix containment and wiring rough-in go in before ceilings and partitions close; second-fix accessories, fixtures and final connections follow — to a clean, tested finish.
- Cable tray, trunking & conduit
- First-fix wiring rough-in
- Final circuits & distribution
- Socket outlets & switches
- Interior & exterior lighting
- Emergency & exit lighting
- Lighting control & dimming
- Second-fix & connections
Earthing, standby power & DEWA testing
We install earthing and lightning protection and standby power, then carry out the full DEWA test regime and coordinate the completion inspection and energisation.
- Earthing grid & bonding
- Lightning protection (LPS)
- Standby generators & ATS
- UPS & critical power
- EV charger points
- Insulation resistance (megger) tests
- Earth-loop, RCD & polarity tests
- DEWA completion & energisation
Our electrical construction process
Design & DEWA Submission
Load schedules, single-line diagrams and drawings prepared and submitted for DEWA NOC and approval.
First Fix
Containment, back-boxes and wiring rough-in installed before ceilings and partitions close.
Boards & Panels
MDBs, sub-DBs, LV panels and switchgear installed, cabled and terminated.
Second Fix
Accessories, light fittings and final connections completed to a clean finish.
Testing & Commissioning
Insulation, earth-loop, RCD and polarity testing, with signed results.
DEWA Inspection & Handover
DEWA completion inspection, energisation, as-builts and O&M documentation.
DEWA-compliant, tested & certified
- DEWA technical regulations, UAE wiring rules & IEC
- DEWA NOC before work & completion inspection
- Signed insulation, earth-loop, RCD & polarity test records
- ADDC (Abu Dhabi) & SEWA/FEWA where applicable
Industries & properties we serve
Key benefits
DEWA-approved & certified
First & second fix in-house
LV panels built to spec
Full signed test records
On-programme delivery
Standby & EV-ready
Frequently asked questions
Are you a DEWA-approved electrical contractor?
Yes. AlphaStone is a DEWA-approved electrical contractor (and works to ADDC in Abu Dhabi), so we can design, submit, install, test and energise LV electrical installations in line with DEWA technical regulations.
Do you handle the DEWA approval and inspection process?
Yes. A DEWA NOC is required before work begins and a DEWA completion inspection before the installation can be energised. We prepare the load schedules and single-line diagrams, submit for approval, and coordinate the inspection and energisation.
What is the difference between first fix and second fix electrical?
First fix is the containment and wiring rough-in (tray, trunking, conduit, back-boxes and cables) installed before ceilings and partitions are closed. Second fix is fitting the accessories, light fittings and making final connections after the finishes are in.
What electrical testing do you carry out?
The full DEWA regime – insulation resistance (megger), earth continuity and earth-loop impedance, RCD operation and polarity – with results documented and signed by our DEWA-approved contractor before energisation.
Do you install LV panels and distribution boards?
Yes. We supply, install and terminate MDBs, sub-distribution boards (SMDB), LV panels, switchgear and busbar, sized from the approved load schedules and single-line diagrams.
Do you provide load schedules and single-line diagrams?
Yes. These are core DEWA deliverables and we prepare them as part of the design and submission.
Do you install standby generators and EV chargers?
Yes. We design and install standby generators, ATS and UPS, plus EV charger points, as part of the electrical scope.
Which projects and emirates do you cover?
Villas, offices, retail, warehouses, industrial and mixed-use construction projects across Dubai, Abu Dhabi, Sharjah and the wider UAE.
Related MEP services
Serving all seven emirates
Start your project with AlphaStone
Free site survey and a no-obligation, fixed quote. Prefer to talk? Call or WhatsApp +971 56 409 7777.
- Free site survey & honest advice
- Transparent, fixed pricing
- Compliant (SIRA / ADMCC / BICSI) design
- One contractor for cabling, network & security